Huaying Technology Logo
Construction Industry Solutions
Construction

Construction EngineeringIndustry Solutions

Manage progress, safety, and geometric precision together.

Consult on Selection

3 items

Security / Progress / Deformation

mm-level

Specified accuracy range of the monitoring instrument

1 sets

Compare 3D Model with Drawings

What problem does this industry solve?

The three key requirements for engineering projects are clear: site safety must be visible, progress must be trackable, and structural deformation must be measured with precision. We organize our equipment around a strategy of "aerial monitoring for surfaces, ground-level checks for points, and instrument-based measurements down to the millimeter."

Common Challenges

  • 01Large construction site; manual safety inspections cause delayed issue detection.
  • 02Progress reports rely on photos that do not match the BIM model.
  • 03Frequent monitoring of foundation pit and high-formwork deformation; manual readings are time-consuming.

Solution Components

Construction Engineeringindustry3package

Each solution links to specific brands and product pages available on the site, allowing flexible combinations based on project scale.

Construction Site Progress and Safety Inspection

Proposal01

Site Progress and Safety Inspection

One panoramic image per day, with issue localization.

Drones fly fixed routes daily to capture aerial imagery for orthophotos and panoramas. Issues such as missing hard hats, edge protection gaps, and improper material stacking are marked on maps and assigned for rectification.

General contracting construction site for buildingMunicipal EngineeringLarge-scale Campus Construction
View Plan Details
Comparison of Real-World 3D and BIM

Proposal02

Comparison of Real-Scene 3D and BIM

Layer-by-layer comparison between model and site

Capture multi-angle imagery with oblique photography cameras, generate reality-based 3D models using modeling software, overlay with design models to check deviations, and output layered progress comparisons.

Construction of Irregular StructuresRetrofitting Existing BuildingsAs-built survey
View Plan Details
Deformation Monitoring and Engineering Surveying

Proposal03

Deformation Monitoring and Engineering Surveying

Record millimeter-level changes by cycle

Install monitoring points for foundation pits and high-formwork systems; observe them periodically using RTK and high-precision instruments. Use scanners to capture point clouds of structural surfaces and generate deformation trend curves.

Deep excavationHigh-Rise Formwork and Shoring SystemsBridges and Tunnels Structures
View Plan Details

TakeConstruction EngineeringLet's finalize the industry list first.

Share your scenario, number of points, and existing equipment details. We'll provide a project-specific selection list including model numbers, quantities, and implementation steps.

Submit Request

Other Industries

Beijing ICP License No. 2026026760